SWANCOMMStaff tools

PV (Solar) site information

Plan View of the Building

NESW
Legend YOU ARE HERELocation of this sign INVInverter (PCE) SBSwitchboard / meter box DPDC disconnection point BATBattery DC cable path Roof lines

Battery

BAT mm mm mm
Battery installed on room behind

System details

WARNING: DC disconnection points can only be operated by suitably qualified personnel.

Saving as a PDF

In the next window, set the printer (or destination) to Save as PDF, then click Save.